
Healthcare
Greater Lancashire
Hospital
Operating theatre expansion: a new theatre suite, air handling unit and backup generator, built inside a working hospital.
The brief
What we were
asked to solve
The hospital needed a new operating theatre, air handling unit and backup generator to keep up with growing demand for surgery. The existing facilities could no longer cope with the patient load or the surgical work being asked of them.
All of it had to be built inside a live hospital. Infection control had to hold throughout, clinical services could not be interrupted and every HTM requirement had to be met, while specialist medical services, structure and M&E went in at the same time.
A new theatre suite, built in a working hospital, with zero disruption to patient care.
Our approach
How Cornerstone
delivered it
We coordinated the design, structural work and full fit out of the new theatre suite, including an advanced air handling unit and a backup generator for uninterrupted power.
Every stage was phased around the hospital's own operations, and infection control was maintained from start to finish.
The result
What we
achieved
New operating theatre suite delivered on time and within budget, expanding surgical capacity straight away.
Zero disruption to patient care throughout the construction programme.
Advanced air handling unit installed to keep conditions sterile and infection control tight.
Backup generator commissioned, giving reliable emergency power for critical procedures.
Full HTM compliance, with all commissioning and statutory sign-offs completed before handover.
Project photography
The finished spaces
Project details
Client
Greater Lancashire HospitalSector: HealthcareLocation
Preston, LancashireLive hospital environmentServices
New BuildNew Build, Quality Interiors, Manufactured JoineryHave a healthcare
project in mind?
Clinical buildings leave no margin for error. Tell us what has to be built and what has to keep running around it.








